August 19, 2023
by Mike McDevitt
The Main parking lot remains closed to all parking. The Carport remains available for drop-off. Please continue to park on Whittier, Verheyden’s, and on area side streets. Please observe all parking signs. Please continue to walk, ride bikes if you are able. Great job St. Clare family on your cooperation during these early weeks of construction. We are making progress!
The new water main should be connected this week. The storm water detention system is being installed at a great clip. Once this is complete, the underground team will trench and add the new storm water catch basins and pipes. The asphalt team is anxious to come back to do grading and preparation for asphalt work.